[vc_row][vc_column][rev_slider slidertitle=”pages-slider” alias=”slider-1-1″ offset=””][gsf_space desktop=”90″ tablet=”70″ tablet_portrait=”60″ mobile_landscape=”50″ mobile=”40″][/vc_column][/vc_row][vc_row][vc_column][vc_tta_tabs active_section=”1″][vc_tta_section title=”UAE” tab_id=”1610472618183-40f8ffb9-9f0e”][vc_row_inner][vc_column_inner][vc_raw_html]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[/vc_raw_html][vc_column_text el_id=”uae_2005-present”]
Projects Executed in the year 2005-Present
[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: Complete Electro-Mechanical Works
PETRA KSA FACTORY
Client: PETRA /Industrial Engineering Co.
Value: 30,342,944.00
Period: 2009 – 2011[/vc_column_text][vc_separator][vc_column_text]Project: Complete Electro-Mechanical Works
Sheikh Mohamed Ben
Client: Abdoulwahab Foundation / LADA
Value: 19,860,000.00
Period: 2008 – 2010[/vc_column_text][vc_separator][vc_column_text]Project: Turn Key Job
Avalon Pharmacy Factory
Client: AVALON CO. LTD.
Value: 14,000,000.00
Period: 2008 – 2010[/vc_column_text][vc_separator][vc_column_text]Project: Royal Amwaj Hotel & Spa, Palm Island Dubai 6 Star
(Contrat100m USD)
Client: Royal Amwaj
Value: 100,000,000.00
Period: 2008 – 2011[/vc_column_text][vc_column_text el_id=”uae_1986-1995″]
Projects Executed in the year 1986-1995
[/vc_column_text][vc_column_text]Project: Water Injection Project Habshan UAE
Responsible for all Mechanical & E.C & I installation
Client: Water Injection, Project Habshan
Value: 90,000,000.00 USD
Period: 1988 – 1993[/vc_column_text][vc_raw_html]JTNDZGl2JTIwc3R5bGUlM0QlMjJ0ZXh0LWFsaWduJTNBbGVmdCUzQiUyMiUzRSUwQSUzQ2ElMjBjbGFzcyUzRCUyMmJ0bl90b3AlMjIlMjBocmVmJTNEJTIyJTIzdWFlXzIwMDUtcHJlc2VudCUyMiUzRUJhY2slMjB0byUyMHRvcCUzQyUyRmElM0UlMEElM0MlMkZkaXYlM0U=[/vc_raw_html][/vc_column_inner][vc_column_inner width=”1/2″][vc_column_text]Project: Rotana, Shangri-La & Merweb Hotels 4 & 5 Star Hotels
Doha
Client: Rotana
Value: 110,000,000.00
Period: 2009 – 2011[/vc_column_text][vc_separator][vc_column_text]Project: Marriot Renaissance & Court Yard Hotel & Apartments
4 & 5 Star Doha
Client: Marriot
Value: 0,000,000.00
Period: 2009 – 2011[/vc_column_text][vc_separator][vc_column_text]Project: Star Condominiums & Hotel on Palm Island, Dubai
.–
Client:–
Value: 6,000,000.00
Period: 2008 – 2009[/vc_column_text][vc_separator][/vc_column_inner][vc_column_inner][/vc_column_inner][vc_column_inner][/vc_column_inner][/vc_row_inner][/vc_tta_section][vc_tta_section title=”Saudi Arabia” tab_id=”1610472618208-688c013d-ddf9″][vc_row_inner][vc_column_inner][vc_raw_html]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[/vc_raw_html][vc_column_text el_id=”ksa_2005_present”]
Projects Executed in the year 2005-Present
[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: Complete Electro-Mechanical Works
ROOMZ
Client: ALMUTLAQ HOLDING GROUP
Value: 14,500,000.00
Period: 2009 – 2011[/vc_column_text][vc_separator][vc_column_text]Project: Responsible for managing all design output
.-
Client:–
Value: 1,200,000,000.00
Period: 2008 – 2009[/vc_column_text][vc_separator][vc_column_text]Project: Supply & Installation of Chilled water piping and ducting, D.D.C Control Complete HVAC System
University Science & Business College
Client: Ministry of Higher Education
Value: 22,800,000.00
Period: 2007 – 2009
[/vc_column_text][vc_separator][vc_column_text]Project: Supply & Installation of HVAC System for Clean Room Facility
Deef Pharmacy Factory
Client: Deef Pharmacy Co. Ltd
Value: 13,100,000.00
Period: 2007 – 2009
[/vc_column_text][vc_separator][vc_column_text]Project: KSA design Team Leader
Client: –
Value: 1,200,000,000.00
Period: 2007 – 2008[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/2″][vc_column_text]Project: Complete Electro-Mechanical Works
Kingdom Tower Mall Expansion
Client: RAWAFED ALTAAAMR
Value: 15,342,944.00
Period: 2009 – 2011
[/vc_column_text][vc_separator][vc_column_text]Project: 2 x 50 storey Hotels for the Marriott Group.
Responsible for all MEP Services from installation; Installation through to Commissioning
Client: Marriott Group
Value: 8,000,000,000.00
Period: 2008 – 2009[/vc_column_text][vc_separator][vc_column_text]Project: Supply & Installation Computer Room System
JEDDAH LAB
Client: AL OMAR
Value: 7,760,000.00
Period: 2007 – 2009[/vc_column_text][vc_separator][vc_column_text]Project: Supply & Installation of Complete Electro-Mechanical Works
Technical College Qwayayah
Client: Techinical and Vocational / Training Corporation
Value: 46,400,000.00
Period: 2007 – 2009[/vc_column_text][vc_separator][vc_column_text]Project: Supply & Installation of Air Cooled Chillers System
Client: AL SAFI YOGHURTS FACTORY
Value: 21,300,000.00
Period: 2007 – 2009
[/vc_column_text][vc_separator][vc_column_text]Project: Supply & Installation of ducting and complete HVAC System
Handicap Center Jeddah
Client: Ministry of Social Welfare
Value: 1,900,000.00
Period: 2006 – 2008
[/vc_column_text][/vc_column_inner][/vc_row_inner][/vc_tta_section][vc_tta_section title=”Qatar” tab_id=”1610472669794-3dabd242-7b9a”][vc_row_inner][vc_column_inner][vc_raw_html]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[/vc_raw_html][vc_column_text el_id=”qtr_2005_present”]
Projects Executed in the year 2005-Present
[/vc_column_text][vc_column_text]Result not found[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]
I am text block. Click edit button to change this text. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/2″][/vc_column_inner][/vc_row_inner][/vc_tta_section][vc_tta_section title=”Europe” tab_id=”1610472694204-4021a4eb-d653″][vc_row_inner][vc_column_inner][vc_raw_html]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[/vc_raw_html][vc_column_text el_id=”eur_2005_present”]
Projects Executed in the year 2005-Present
[/vc_column_text][vc_column_text]Result not found[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_column_text el_id=”eur_1986-1995″]
Projects Executed in the year 1986-1995
[/vc_column_text][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: M&E installation for corporation HQ
–
Client: (Cable & Wireless Ltd) Holborn, London UK
Value: 32,000,000.00 £
Period: 1988 – 1993[/vc_column_text][vc_column_text]Project: M&E services, for a Japanese Ball Bearing
Manufacturing Plant, Dodsworth. UK
Client: Plant Japanese Ball Bearing
Value: 68,000,000.00 £
Period: 1988 – 1993[/vc_column_text][vc_column_text]Project: E.C & I, installation at Ryehouse, UK 750 MW
Combined Cycle Power Plant
Client: Combined Cycle Power Plant
Value: 20,000,000.00 £
Period: 1988 – 1993[/vc_column_text][vc_column_text el_id=”eur_1977-1985″]
Projects Executed in the year 1977-1985
[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/2″][vc_column_text]Project: E.C & I installation for experiential chemical plant
–
Client: Merck Sharpe & Dhome, Enfield UK
Value: 2,000,000.00 £
Period: 1988 – 1993[/vc_column_text][vc_column_text]Project: E.C & I, installation at Killingholme, UK 1100MW
Combined Cycle Power Plant
Client: Combined Cycle Power Plant
Value: 45,000,000.00 USD
Period: 1988 – 1993[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: PASIR GUDANG POWER STATION, PHASE 1
ASEA 132 kv Switchgear & Auxiliary
Client: Plant Sweden
Value: 300,000.00
Period: 1982-1983[/vc_column_text][vc_raw_html]JTNDZGl2JTIwc3R5bGUlM0QlMjJ0ZXh0LWFsaWduJTNBbGVmdCUzQiUyMiUzRSUwQSUzQ2ElMjBjbGFzcyUzRCUyMmJ0bl90b3AlMjIlMjBocmVmJTNEJTIyJTIzZXVyXzIwMDVfcHJlc2VudCUyMiUzRUJhY2slMjB0byUyMHRvcCUzQyUyRmElM0UlMEElM0MlMkZkaXYlM0U=[/vc_raw_html][/vc_column_inner][vc_column_inner width=”1/2″][vc_column_text]Project: BERSIA HYDRO-PLANT
3 X 24 MW Generators & Auxiliary Elect. System
Client: Siemens – Germany
Value: 384,753.40
Period: Jun-82 – Dec-83[/vc_column_text][/vc_column_inner][/vc_row_inner][/vc_tta_section][vc_tta_section title=”Sudan” tab_id=”1610472711740-bc29ae69-3353″][vc_row_inner][vc_column_inner][vc_raw_html]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[/vc_raw_html][vc_column_text el_id=”sud_2005_present”]
Projects Executed in the year 2005-Present
[/vc_column_text][vc_column_text]Result Not Found[/vc_column_text][vc_column_text el_id=”sud_1986-1995″]
Projects Executed in the year 1986-1995
[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: Melut Basin, Bashhayer 2 Marine Terminal Facilities
–
Client: Sudan, Melut Basin
Value: 232,000,000.00 USD
Period: 1994 – 2006[/vc_column_text][vc_raw_html]JTNDZGl2JTIwc3R5bGUlM0QlMjJ0ZXh0LWFsaWduJTNBbGVmdCUzQiUyMiUzRSUwQSUzQ2ElMjBjbGFzcyUzRCUyMmJ0bl90b3AlMjIlMjBocmVmJTNEJTIyJTIzMjAwNV9wcmVzZW50JTIyJTNFQmFjayUyMHRvJTIwdG9wJTNDJTJGYSUzRSUwQSUzQyUyRmRpdiUzRQ==[/vc_raw_html][/vc_column_inner][vc_column_inner width=”1/2″][/vc_column_inner][/vc_row_inner][/vc_tta_section][vc_tta_section title=”India” tab_id=”1621948264489-4ac799c4-7de0″][vc_row_inner][vc_column_inner][vc_raw_html]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[/vc_raw_html][vc_column_text]
Projects Executed in the year 2005-Present
[/vc_column_text][vc_column_text]Result not found[/vc_column_text][vc_column_text]
Projects Executed in the year 1986-1995
[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: BOILER MAINTENANCE / REPAIR WORK
–
Client: Yoshimine Boiler / Maxithern Boiler / B&W Boiler / ISGEC John / Thompson India / Mechmar Boiler
Value: 1,118,635.00
Period: Jan-91 – Nov-91[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/2″][vc_column_text]Project: BOILER MAINTENANCE/REPAIR
–
Client: Yoshimine Boiler / Maxitherm Boiler / Takuma Boiler / B & W Boiler / Mechmar Boiler / Allen Ignis Boiler / ISGEC John – Thompson India
Value: 1,403,422.00
Period: Jan-90 – Dec-90[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: NEB NORTHERN DEVELOPMENT AREA
33/11 kv outdoor switchgear (9 sub-stations)
Client: Siemens – India
Value: 200,000.00
Period: 1987 – 1990[/vc_column_text][vc_column_text]
Projects Executed in the year 1977-1985
[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/2″][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: PASIR GUDANG POWER STATION, PHASE 1
2 X 120MW Steam Boiler
Client: BHEL – INDIA
Value: 1,000,000.00
Period: 1980-1982[/vc_column_text][vc_raw_html]JTNDZGl2JTIwc3R5bGUlM0QlMjJ0ZXh0LWFsaWduJTNBbGVmdCUzQiUyMiUzRSUwQSUzQ2ElMjBjbGFzcyUzRCUyMmJ0bl90b3AlMjIlMjBocmVmJTNEJTIyJTIzaW5fMjAwNV9wcmVzZW50JTIyJTNFQmFjayUyMHRvJTIwdG9wJTNDJTJGYSUzRSUwQSUzQyUyRmRpdiUzRQ==[/vc_raw_html][/vc_column_inner][vc_column_inner width=”1/2″][vc_column_text]Project: Prai Power Station, Stage 3a
3 X 120MW Steam Boiler
Client: Bhel – INDIA
Value: 1,500,000.40
Period: 1977-1980[/vc_column_text][/vc_column_inner][/vc_row_inner][/vc_tta_section][vc_tta_section title=”Malaysia” tab_id=”1610472721610-08588479-2738″][vc_row_inner][vc_column_inner][vc_raw_html]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[/vc_raw_html][vc_column_text]
Projects Executed in the year 2005-Present
[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: SUPPLY, TESTING, DELIVERY OF STINGER SYSTEM IBEAM SUPPORT WORKS
MASS TRANSIT LEMBAH KELANG JAJARAN
Client: SUNGAI BULOH-KAJANG /MEIDEN MALAYSIA SDN BHD
Value: 50,000,000.00
Period: Apr-14 – In Progress
[/vc_column_text][vc_separator][vc_column_text]Project: PROPOSED HOTEL DEVELOPMENT ON LOT 10,11,12,13,14 & 15 AT THE EXISTING 72 UNIT KEDAI PEJABAT 2/4 TINGKAT DIATAS SEBAHAGIAN LOT 984 (Lot lama 620) DAN LOT 982 (LOT LAMA 617) MUKIM KUALA SELANGOR DAN KAMPUNG PASIR PENAMBANG, UNTUK TETUAN GOLDPAGE ASSETS SDN
Client: UTAMAL LAND SDN BHD
Value: 574,651.00
Period: May-13 – Jan-14
[/vc_column_text][vc_separator][vc_column_text]Project: PROPOSED FOR CONSTRUCTION OF 72 UNITS SHOP OFFICE, KUALA SELANGOR
Fire Fighting Works
Client: Utamal Land Sdn Bhd
Value: 115,900.00
Period: Nov-12 – Jan-13[/vc_column_text][vc_separator][vc_column_text]Project: INDUCTION FURNACE MINI MILL AT BERANANG, SELANGOR
Supply, delivery, installation, testing and Commissioning of Process Water Piping System
Client: Spring Bond Sdn Bhd
Value: 650,000.00
Period: Aug-08 – Mar-09
[/vc_column_text][vc_separator][vc_column_text]Project: INDUCTION FURNACE MINI MILL AT BERANANG, SELANGOR
Supply, delivery, installation, testing and Commissioning of Electrical LV System
Client: Spring Bond Sdn Bhd
Value: 665,456.00
Period: Jun-08 – Sep-08
[/vc_column_text][vc_separator][vc_column_text]Project: SEGUNTOR BIOPOWER 11.5MW EFB POWER PLANT , SANDAKAN SABAH
Supply, delivery, installation, testing And commissioning of Mechanical Services
Client: Meiden Electric; Engineering Sdn.Bhd.
Value: 2,408,860.00
Period: Oct-07 – Mar-09
[/vc_column_text][vc_separator][vc_column_text]Project: PROPSEDCONSTRUCTION BUILDING FOR 10 UNIT 3 ½ STOREY OFFICE SHOPLOT & 10 STOREY BUILDING DAERAH PETALING, SELNAGOR DARUL EHSAN.
Supply, delivery installation, testing and Commissioning of Electrical Services
Client: Mandarin Purpose Sdn.Bhd.
Value: 1,230,000.00
Period: May-07 – May-09
[/vc_column_text][vc_separator][vc_column_text]Project: WATER WORKS GREATERPHASE 2 CONSTRUCTION AND COMPLETION WATER DAM AT SUNGAI CHEREH, KUANTAN
Supply, delivery, installation, testing and Commissioning of Electrical Services
Client: AAY_MMN JV
Value: 5,853,915.00
Period: May-05 – Aug-08
[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/2″][vc_column_text]Project: PROPOSED DEVELOPMENT 1 BLOCK SPACE BUSINESS (BUSINESS SUITES) 21 FLOOR AT JALAN RAJA MUDA ABDUL AZIZ, KUALA LUMPUR
Design, Construct and Completion of ELV, Generator Set, Façade & External Lighting, Lightning Protection, PA System, SMATV, ICT, CCTV, Card Access System, Air Cond, Traffic Light & Boom Gate Works
Client: Pembinaan Luhur / Usaha Sdn Bhd
Value: 30,692,000.00
Period: Dec-13 – In Progress
[/vc_column_text][vc_separator][vc_column_text]Project: CADANGAN KELULUSAN PELAN LAMPU JALAN BAGI PEMBINAAN SEBUAH PASARAYA 1 TINGKAT BESERTA 1 TINGKAT MEZZANINE DI ATAS SEBAHAGIAN LOT 619, MUKIM KUALA SELANGOR DAN KAMPUNG PASIR PENAMBANG, DAERAH KUALA SELANGOR, SELANGOR DARUL EHSAN TUK TETUAN GOLDPAGE ASSETS
Street Lighting Services
Client: Utamal Land Sdn Bhd
Value: 80,000.00
Period: Apr-13 – July-13
[/vc_column_text][vc_separator][vc_column_text]Project: IKAN MARIN INCUBATOR, AT SETIU, TERENGGANU
Proposed construction for fish farm; Supply, delivery installation, testing and Commissioning of Electrical System
Client: Jurutiara Sdn Bhd
Value: 881,637.00
Period: Dec-10 – Sep-12
[/vc_column_text][vc_separator][vc_column_text]Project: INDUCTION FURNACE MINI MILL AT BERANANG, SELANGOR
Supply, delivery, installation, testing and commissioning of Hydrant & Water Reticulation Works System
Client: Spring Bond Sdn Bhd
Value: 120,000.00
Period: Aug-08 – Mar-09
[/vc_column_text][vc_separator][vc_column_text]Project: INDUCTION FURNACE MINI MILL AT BERANANG, SELANGOR
HT Electrical and Associated Works
Client: Spring Bond Sdn Bhd
Value: 657,204.00
Period: May-08 – Aug-08
[/vc_column_text][vc_separator][vc_column_text]Project: PROPOSED CONSTRUCTION FOR DOUBLE STOREY BANGLO HOUSE WITH BASEMENT AT TROPICANA GOLF & COUNTRY RESORT, PETALING JAYA, SELANGOR
Supply, delivery, installation, testing and commissioning of Electrical LV, Communication & Aircond System
Client: Mr. Andrew M.S. Tan
Value: 179,000.00
Period: Mar-08 – Aug-08
[/vc_column_text][vc_separator][vc_column_text]Project: KINA BIOPOWER 11.5MW EFB POWER PLANT , SANDAKAN, SABAH
Supply, delivery, installation, testing and Commissioning of Mechanical Services
Client: Meiden Electric; Engineering Sdn.Bhd.
Value: 2,448,000.00
Period: Aug-07 – Aug-08
[/vc_column_text][vc_separator][vc_column_text]Project: TETUAN SUTERA CERIA SDN BHD PROPOSED EXTENSION FOR 2-STOREY FACTORY AND 2 STOREY OFFICE AT EXISTING OFFICE/WAREHOUSE AT BANGI, SELANGOR
Supply, delivery, installation, testing and Commissioning of Electrical Services.
Client: Sutera Ceria
Value: 500,000.00
Period: Oct-05 – Jul-06
[/vc_column_text][vc_separator][vc_column_text]Project: 3 x 700MW COALED FIRED TANJUNG BIN POWER PLANT
Supply, delivery, installation, testing and Commissioning of Electrical & Telecommunication Services
Client: Kejuruteraan R.E. Morris; ASAS JV
Value: 9,392,665.00
Period: Mar-05 – May-08
[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_column_text]
Projects Executed in the year 1996-2004
[/vc_column_text][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: Supply and installation of HVAC system
Packaged mini split ducting system
Client: Riyadh Cement Company
Value: 117,000.00
Period: 2004 – 2006[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/2″][vc_column_text]Project: HOKUSHIN (M) SDN SHAH ALAM
Supply, delivery, installation, testing and Commissioning of Electrical Services
Client: Meiden Electric; Engineering Sdn Bhd
Value: 64,000.00
Period: Jun-04[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: (PCSBW SHOP) FOR PERODUA FACTORY AT SG CHOH, RAWANG SELANGOR
Supply, delivery, installation, testing and Commissioning of Electrical Services
Client: Meiden Electric; Engineering Sdn Bhd
Value: 22,000.00
Period: May-04[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/2″][vc_column_text]Project: SESC SHAH ALAM
Supply, delivery, installation, testing and Commissioning of Mechanical Ventilation & Electrical Services
Client: Sumitomo Electric; Sintered Components (Malaysia) Sdn.Bhd.
Value: 37,030.00
Period: May-04[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: NAZA AUTOMOTIVE MANUFACTURING PLANT AT GURUN, KEDAH
HT & Electrical installation and associated services
Client: Kejuruteraan R.E. Morris Sdn.Bhd.
Value: 347,200.00
Period: Mar-04 – Apr-04[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/2″][vc_column_text]Project: MANTISSA INSTITUTE AT TTDI, KUALA LUMPUR
Supply, delivery, installation, testing and Commissioning of Electrical
Client: Mantissa Institute
Value: 61,300.00
Period: Feb-04[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: SG. MUAR BRIDGE – PACKAGE H1
Supply labour, testing & commissioning of electrical services to bridge over Sungai Muar
Client: Ranhill Civil/ Kejuruteraan R.E. Morris Sdn.Bhd.
Value: 329,900.00
Period: Jun-03 Oct-03[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/2″][vc_column_text]Project: TETUAN SUTERA CERIA PROPOSED CONSTRUCTION FOR SINGLE STOREY WAREHOUSE AND 4 STOREY OFFICE LOT AT BANGI, SELANGOR
Supply, delivery, installation, testing and Commissioning of electrical, telephone, Air-conditioning and mechanical ventilation system
Client: Sutera Ceria Sdn.Bhd.
Value: 1,138,000.00
Period: Apr-03 – May-05[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: Supply and installation of HVAC system
Packaged mini split ducting system; Extension of Malaz jail
Client: Ministry of Interior
Value: 1,200,000.00
Period: 2002 – 2004[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/2″][vc_column_text]Project: POWER HOUSE PROTON FACTORY AT SHAH ALAM, DELANGOR
Supply, installation, testing & Commissioning of Electrical Services
Client: Meiden Electric Engg. Sdn.Bhd
Value: 126,000.00
Period: Nov-01 – June-02[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: RAAF Base, BUTTERWORTH, PENANG
Supply, installation, testing, commissioning of Electrical, Instrumentation, Fire Protection Services, Compress air piping, air-conditioning & ventilation in Fuel Farm & Building Area
Client: Transfield(M) Sdn.Bhd
Value: 1,297,611.00
Period: Sept-01 – Mar-02[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/2″][vc_column_text]Project: PROPOSED CONSTRUCTION & COMPLETION OF 8 BLOCKS OF 7 STOREY LOW MEDIUM COST APARTMENT AT BANDAR PINGGIRAN SUBANG SEKSYEN U5 SHAH ALAM, SELANGOR.
Supply, installation, testing & commissioning of Electrical,Telephone, MATV, Fire Protection & Street Lighting Systems
Client: Agmal Development Sdn.Bhd
Value: 4,013,406.00
Period: Apr-01 – Mar-04[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: Supply and installation of HVAC system
(chiller, FCU, AHU, packaged mini split ducting system)
Client: Haqal General Hospital; Ministry of Health
Value: 900,000.00
Period: 2000 – 2002[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/2″][vc_column_text]Project: Supply and installation of HVAC system (chiller, FCU, AHU, packaged mini split ducting system)
100 Bed prince musad bin jalwi hospital
Client: Ministry of health
Value: 4,130,000.00
Period: 2000 – 2002[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: Supply and installation of HVAC system (chiller, FCU, AHU, packaged mini split ducting system)
Kingdom trade center
Client: Kingdom holding Co
Value: 1,800,000.00
Period: 2000 – 2002[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/2″][vc_column_text]Project: DESIGN & BUILT SCHOOLDANAU KOTA FOR MOE
Supply, installation & commissioning of Electrical, Telephone, Lightning Protection, Earthing, P.A System, Fire Protection System, Hydrant & Plumbing Services.
Client: Juara Prestasi Sdn.Bhd
Value: 1,500,000.00
Period: Aug-00 – Oct-04[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: TG. LANGSAT COGENERATION , JOHOR
Mechanical equipment installation in turbine area
Client: OGP Techincal Services Sdn.Bhd
Value: 280,000.00
Period: Aug-00 – Sep-00[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/2″][vc_column_text]Project: SECTION U5, SHAH ALAM, MUKIM SG. BULOH, SELANGOR
Construction, completion and maintenance of earth work and other associated work for proposed low cost and medium cost apartment
Client: Agmal Development Sdn.Bhd
Value: 863,015.00
Period: Jun-00 – Sep-00[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: COMMERCIAL MINERAL MALAYSIA SDN.BHD PASIR GUDANG, JOHOR
Supply & installation of electrical and firefighting services & all associated works
Client: Transfields
Value: 72,012.00
Period: Jul-00 – Oct-00[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/2″][vc_column_text]Project: PROTON, SHAH ALAM
Charger at Forklift Repair Shed Electrical supply for Re-locate Battery
Client: Meiden
Value: 47,000.00
Period: Mar-00 – Apr-00[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: PROTON UTILITIES FOR M41 SATELITE LINE SHAH ALAM
Supply and installation of lighting and small power
Client: Meiden
Value: 89,366.00
Period: Oct-99 – Nov-99[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/2″][vc_column_text]Project: KHTP INDEPENDENT POWER UTILITY , KULIM
Supply & installation of earthing system
Client: Mudajaya Corporation
Value: 212,843.00
Period: Oct-99 – Mar-01[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: MOTOROLA (M) SDN.BHD
Installation of HT equipment & cabling work
Client: Mayplus Corporation
Value: 77,760.00
Period: Jul-99 – Dec-99[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/2″][vc_column_text]Project: MVF PROTON – GX , SHAH ALAM
Supply & installation for the new machine At the paint shop
Client: Meiden
Value: 75,000.00
Period: Aug-99 – Sep-99[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: MEGASTEEL SDN, BHD, KUALA LANGAT
Assembly, testing & commissioning of 6 units; Siemens 11.5 MVA transformers at finishing
Client: Mill switch house; Megasteel
Value: 115,000.00
Period: Nov-97 Jun-98[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/2″][vc_column_text]Project: TNB CONTRACT 114/96 (TNB 306495 – MHC)
Filtration & vacuuming of 132/11kv 2 x 30MVA; Power transformers at Seremban 2
Client: EPE Reyrolle
Value: 30,000.00
Period: Apr-98 – May-98[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: TNB NO. 332595 132/11KV PAGOH SUB-STATION
Installation of elect. Works
Client: Projass / TNB
Value: 51,000.00
Period: Nov-97 – 1998[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/2″][vc_column_text]Project: MEGASTEEL/AMSTEEL PLANT AT KUALA LANGAT, SELANGOR
Erect of 6 x 180 MVA 275/33kv; 5 x 30/45MVA; 33/11kv power transformers
Client: Megasteel / Amsteel; Siemens
Value: 426,000.00
Period: 1997 – Jun-98[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: BUKIT RAJA MALAYSIAN STEEL MILL
Vacuuming & oil purification work for 132/11kv 1 x 80 MVA power transformer
Client: Siemens
Value: 50,000.00
Period: 1997 – 1997[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/2″][vc_column_text]Project: TNB CONTRACT 171/96 (TNB 310895 – MAINHEAD) OIL PURIFICATION BUKIT KAYU HITAM SUB-STATION
Erection & oil purification for 2 x 132/33kv 90MVA transformer, 2 x 132/11kv 39 MVA transformer
Client: EPE Reyrolle
Value: 123,600.00
Period: 1997 – 1997[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: TNB 306495 PASIR PANJANG 132/11KV SUB-STATION SG. SEMENYIH 132 KV (EXTENSION) SUB-STATION
Supply & erection of 132/11kv transmission equipment
Client: ABB/TNB
Value: 415,000.00
Period: 1996 – 1998[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/2″][vc_column_text]Project: 132/33 KV GAS-SUB-STATION BAYAN LEPAS,
Erection of 2 x 90 MVA 132/33kv; 2 x 30 MVA 33/0.415kv earthing
Client: PSE (AMBC/TNB)
Value: 148,000.00
Period: Sep-96 – Nov-96[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: 275KV JURU OUTDOOR SWITCHING STATION, PENANG
Installation of 1 x 100MVAR & 2 x 40 MVAR Shunt Reactors
Client: PSE (Siemens/TNB)
Value: 63,000.00
Period: 1996 – 1996[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/2″][vc_column_text]Project: CCMC CHLOR – ALKALI PROJECT, JOHOR
Installation of ectifier transformer & Al.Bushar c/w accessories
Client: Meiden
Value: 84,000.00
Period: Jun-96 – Oct-96[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: TORAY PLASTIC (M) SDN.BHD MT3 PRAI, PENANG
Installation of 2000kw Diesel generator set with auxiliary equipment
Client: Meiden
Value: 270,000.00
Period: Jan-96 – Apr-96[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/2″][vc_column_text]Project: CONNAUGHT BRIDGE POWER STATION, KLANG
WHB 2 Header caps inspection work
Client: TNB
Value: 12,600.00
Period: Nov-96 – Dec-96[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_column_text]
Projects Executed in the year 1986-1995
[/vc_column_text][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: PASIR GUDANG CCPP, JOHOR
Instrumentation piping work
Client: Meiden
Value: 45,000.00
Period: Oct-95 – Nov-95[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/2″][vc_column_text]Project: BOILER MAINTENANCE/REPAIR WORK
–
Client: TNB
Value: 104,650.00
Period: Jan-95 – May-95[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: 132/25KV KTM SOUTH SUB-STATION
2 X 25MVA transformer, filtration & vacuuming
Client: ABB
Value: 18,000.00
Period: Jul 95 -Aug 95[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/2″][vc_column_text]Project: GENTING SANYEN – 132/275 KV SALAK TINGGI SUB STATION
2 X 30MVA Power transformer , filtration & vacuuming
Client: ABB
Value: 18,000.00
Period: Jul 95 -Aug 95[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: HICOM SHAH ALAM 275KV SUB-STATION
2 X 240 MVA power transformer, filtration & Vacuuming
Client: ABB
Value: 30,000.00
Period: Jul 95 -Aug 95[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/2″][vc_column_text]Project: SULTAN ISKANDAR POWER STATION, PASIR GUDANG
Furnace water wall tubes fins & skin casing Damaged/burnt out repairs work
Client: TNB
Value: 23,000.00
Period: May-95 – 1995[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: SULTAN ISKANDAR POWER STATION, PASIR GUDANG
Power plant rehabilitation & gas conversion, Elect. Control & instrumentation work
Client: Siemens AG
Value: 1,000,000.00
Period: Apr-95 – Jul-96[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/2″][vc_column_text]Project: Malaysia Airline Systems Support Facility and Fit-Out
Works at KLIA (Sepang), Malaysia
Client: Malaysia Airline Systems
Value: 60,000,000.00 RM
Period: 1994 – 2006[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: Overall responsibility for successful completion Civil, Building and M&E Services work
At Ammonia Syngas Project at Kerteh Malaysia
Client: Ammonia Syngas Project
Value: 25,000,000.00 RM
Period: 1994 – 2006[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/2″][vc_column_text]Project: All Substations/Field Auxiliary Buildings, for Malaysia
Liquefield Natural Gas Project in Bintulu, Sarawak, East Malaysia
Client: Malaysia Liquefield Natural Gas Project
Value:43,000,000.00 RM
Period: 1994 – 2006[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: Procurement, and Installation of M&E Services Type K
Buildings at Manjung 2100MW Coal Fired Power Plant, Maysia
Client: Coal Fired Power
Value: 80,000,000.00 RM
Period: 1994 – 2006[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/2″][vc_column_text]Project: Pan Pacific Hotel, KLIA
–
Client: Pan Pacific Hotel
Value: 50,000,000.00 USD
Period: 1994 – 2006[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: Procurement, Installation, Testing and Commissioning
For all M&E and related services at Petronas 304 bed State of the Art, Hospital in Kuala Lumpur, Malaysia
Client: Petronas
Value: 233,000,000.00 RM
Period: 1994 – 2006[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/2″][vc_column_text]Project: PAKA CCPP
2 X 168MVA transformer, filtration & VACUUMING
Client: Siemens/YTL
Value: 69,000.00
Period: 1994 – Sept-95[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: PAKA POWER PLANT, TERENGGANU
Transformer oil treatment work
Client: Meidensha
Value: 27,000.00
Period: Sep-94 – Oct-94[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/2″][vc_column_text]Project: TUANKU JAAFAR POWER STATION
Maintenance on Boiler 6 & 7
Client: TNB
Value: 345,230.00
Period: Feb-94 – Nov-94[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: KOMPLEKS PLN CHANGKAT LADA & ULU REDAP,PERAK
Supply, fabrication & installation of 50 ton X 8 nos. Mill Day bin steel structure
Client:Kump. Chemineer Eng. S/B
Value:650,000.00
Period:1994 – 1995[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/2″][vc_column_text]Project: Responsible for M & E Services and E&I installation at
Paka, (900MW) and Pasir Gudang (450MW)
Client:Powerbplants Malaysia
Value:60,000,000.00 RM
Period:1993 – 1997
[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: For complete Mechanical, E&C & I and ancilliary
Equipment Erection for 300MW Simple Cycle Power Plant, Serdang Malaysia
Client:Simple Cycle Power Plant
Value:300,000,000.00 RM
Period:1993 – 1997[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/2″][vc_column_text]Project: Responsible for E&I installation for Segari Power Plant
Lumut (1300 MW) Malaysia
Client:Segari Power Plant
Value:20,000,000.00 RM
Period:1993 – 1997
[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: Open Cycle Power Plant, East Malaysia
Responsible for Independent Power Producer Sabbah execution of Building works, installation of M&E Equipment and E&I installation for the 120 MW
Client:Open Cycle power plant
Value:130,000,000.00 RM
Period:1993 – 1997[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/2″][vc_column_text]Project: PRAI POWER STATION
Power plant rehabilitation & gas conversion Elect. Control & Instrument work
Client:Siemens AG
Value:1,500,000.00
Period:1993 – 1996[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: METRO PACIFIC SDN.BHD, KUALA TERENGGANU
Supply necessary steel & cast iron material, fabricate, installation and commissioning one unit of water tube boiler H600
Client:Kump, Cheminner / Eng. S/B
Value:376,578.00
Period:1993 – Sep-93[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/2″][vc_column_text]Project: SULTAN SALAHUDDIN ABDUL AZIZ POWER ST.
Extension of ash slurry pipeline, Port Klang
Client:Sukitronics S/B
Value:203,740.00
Period:1993 – 1994[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: PROTON NOISE LAB. SHAH ALAM
Installation of Dynamometer & compressor air system
Client:Meiden Electric
Value:133,300.00
Period:Nov-93 – Feb-94[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/2″][vc_column_text]Project: DAIEI KOGYO (M) SDN.BHD
Fabrication & installation of one unit of mild steel vulcanizer
Client:Daiei Kogyo
Value:57,000.00
Period:Mar-93 – Apr-93[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: TEE THE PALM OIL MILL H-375
Boiler re-tubing work
Client:Yoshimine Boiler
Value:53,000.00
Period:Aug-93 – Sep-93[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/2″][vc_column_text]Project: MAJLIS PERBANDARAN KUALA TERENGGANU
Re-tubing work for one unit 9 MW boiler
Client:Yoshimine Boiler
Value:63,000.00
Period:May-93 – Jun-93[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: GULA PADANG TERAP BHD, KUALA NERANG
To supply necessary steel & cast iron materials, fabricate, install & commissioning of one unit of Yashimine Boiler H2200
Client:Kumpulan / Cheminner / Eng. S/B
Value:1,846,680.00
Period:Jan-93 – Sep-93[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/2″][vc_column_text]Project: HUALON TEXTILE, NILAI
Supply & constructing 3 units of Chimney 50M Yoshimine Boiler for boiler
Client:Hualon
Value:110,340.00
Period:Jun-92 – Aug-92[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: TUANKU JA’AFAR POWER STATION, P. DICKSON, PASIR GUDANG POWER STATION,
JOHOR CONNAUGHT BRIDGE POWER STATION, KLANG Maintenance work
Client:TNB
Value:619,706.00
Period:Mar-92 – Nov-92[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/2″][vc_column_text]Project: MALAYSIA SHEET GLASS, PASIR GUDANG
2 X 2500Kw Diesel generating plant c/w Associated equipment & piping system
Client:Meidensha & Nigata
Value:177,000.00
Period:Sep-92 – Mar-93[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: DAIEI KOGYO SDN.BHD.MALACCA
Supply of 5,000 lb/hr boiler & machinery & piping system
Client:Mechmar Boiler
Value:363,953.00
Period:Jun-91 – Jul-91
[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/2″][vc_column_text]Project: TUANKU JA’AFAR POWER STATION
Re-heater tube repair & fuel oil line replace work for boiler no. 5 & 2
Client:TNB
Value:59,285.00
Period:May-91 – Jul-91[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: TUANKU JAAFAR POWER STATION
Maintenance work
Client:TNB
Value:210,792.00
Period:Jan-90 – Dec-90[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/2″][vc_column_text]Project: MALAYSIA FIBRE BOARD
Supply, fabricate & installation of 15,000 kg/hr boiler
Client:Yoshimine Boiler
Value:602,502.00
Period:Aug-90 – Jul-91[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: KARIMOKU RUBBER WOOD FACTORY, MALACCA
7,000 kg/hr water tube boiler
Client:Takahashi Boiler
Value:16,111,500.00
Period:Jun-89 – Dec-89[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/2″][vc_column_text]Project: HOKUSHIN SDN.BHD, SHAH ALAM
2 X 2000 lb/hr robey boiler piping & Machinery installation work
Client:IBAE Boiler
Value:417,484.00
Period:Feb-89 – Dec-89[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: PERMINT PLYWOOD, TERENGGANU
Supply, fabricate, & erect of 40, 000 lb/hr boiler
Client:Yoshimine Boiler
Value:237,998.00
Period:May-88 – Feb-89
[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/2″][vc_column_text]Project: KENERING HYDRO PLANT
3 X 50 MVA power transformer
Client:Mitsubishi Electric
Value:82,000.00
Period:Apr-88 – Oct-88[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: KUALA LUMPUR EAST S/T
2 X 240 MVA & 2 x 90 MVA transformer
Client:Osaka Transformer
Value:54,000.00
Period:Jul-88 – Sep-88[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/2″][vc_column_text]Project: PERMINT PLYWOOD, TERENGGANU
Supply, fabricate & erect of 40,000 lb/hr boiler (H-6000C)
Client:Yoshimine Boiler
Value:237,998.00
Period:May-88 – Feb-89[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: TUANKU JA’AFAR POWER STATION P.D
Maintenance work on 120 MW & 60 MW steam boiler
Client:TNB
Value:249,737.92
Period:Jul-88 – Jul-89[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/2″][/vc_column_inner][/vc_row_inner][vc_column_text]
Projects Executed in the year 1977-1985
[/vc_column_text][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: KL NORTH AND CENTRAL TRANSMISSION DEVELOPMENT
132/33 kv and 33/11 kv transformer
Client:Takaoka & Fuji Electric
Value:148,000.00
Period:Sep-85 – Feb-86[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/2″][vc_column_text]Project: HEAVY OIL MILL
25,000 Ib/hr water tube boiler
Client:Yoshimine Boiler
Value:90,000.00
Period:Sep-84 – Dec-84[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: CHIN TECK OIL MILL
30,000 Ib/hr water tube boiler
Client:Yoshimine Boiler
Value:60,000.00
Period:May-84 – Aug-84[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/2″][vc_column_text]Project: TEE THE OIL MILL
40,000 Ib/hr water tube boiler
Client:Yoshimine Boiler
Value:60,000.00
Period:Jan-84 – Apr-84[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: RAUB OIL MILL
40,000 lb/hr water tube boiler
Client:Yoshimine Boiler
Value:63,000.00
Period:Jan-84 – Mar-84[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/2″][vc_column_text]Project: DAMANSARA HEIGHT S/T
33/11 kv switchgear & cabling work
Client:Fuji Electric
Value:49,149.00
Period:1984
[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: KENYIR HYDRO PLANT
Auxiliary Mechanical System
Client:Raunaq International
Value:189,500.00
Period:1984 – 1985[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/2″][vc_column_text]Project: GAS PANTAI TIMUR, KOTA BAHARU
Air Separation & Acetylene Plants
Client:Nippon Denso
Value:175.00
Period:1984[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: J.K.R TERENGGANU
Water Pumping Station
Client:United Engineer
Value:200,000.00
Period:1984[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/2″][vc_column_text]Project: SEH SDN.BHD
Water Treatment Plant
Client:Kubota – Japan
Value:80,000.00
Period:1984[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: SEH SDN.BHD
Water Purification System
Client:Kubota – Japan
Value:120,000.00
Period:1984[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/2″][vc_column_text]Project: FELDA SELANDANG OIL MILL
18,000 kg/hr Water Tube Boiler
Client:Yoshimine Boiler
Value:139,000.00
Period:Mar-83 – Jul-83[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: PANJI ALAM OIL MILL
2 X 40,000 lb/hr Water Tube Boiler
Client:Yoshimine Boiler
Value:138,000.00
Period:Sep-82 – Jun-83[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/2″][vc_column_text]Project: KENERING HYDRO PLANT
3 X 40 MW Generators & Auxiliary Elect. System
Client:Siemens – Germany
Value:397,375.00
Period:Jan-83 – Jun-84
[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: BERSIA HYDRO PLANT
3 X 30 MVA Power Transformer
Client:Mitsubishi Electric
Value:82,600.00
Period:Jan-83 – Jun-83[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/2″][vc_column_text]Project: KAMPUMG LAMJUT SUB-STATION
33/11kv Switchgear & Cabling Work
Client:Fuji Electric
Value:49,149.00
Period:1983[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: FELDA TENGGAROH OIL MILL
18,000 kg/hr Water Tube Boiler
Client:Yoshimine Boiler
Value:135,000.00
Period:Nov-82 – Jun-83[/vc_column_text][vc_raw_html]JTNDZGl2JTIwc3R5bGUlM0QlMjJ0ZXh0LWFsaWduJTNBbGVmdCUzQiUyMiUzRSUwQSUzQ2ElMjBjbGFzcyUzRCUyMmJ0bl90b3AlMjIlMjBocmVmJTNEJTIyJTIzbWx5XzIwMDVfcHJlc2VudCUyMiUzRUJhY2slMjB0byUyMHRvcCUzQyUyRmElM0UlMEElM0MlMkZkaXYlM0U=[/vc_raw_html][/vc_column_inner][vc_column_inner width=”1/2″][vc_column_text]Project: RAKYAT KETENGAH OIL MILL
2 X 40,000 kg/hr Water Tube Boiler
Client:Yoshimine Boiler
Value:135,000.00
Period:Jan-82 – Jul-82[/vc_column_text][/vc_column_inner][/vc_row_inner][/vc_tta_section][vc_tta_section title=”North Korea” tab_id=”1610472742073-b011c9de-f2bc”][vc_row_inner][vc_column_inner][vc_raw_html]JTNDZGl2JTIwc3R5bGUlM0QlMjJ0ZXh0LWFsaWduJTNBY2VudGVyJTNCcGFkZGluZy10b3AlM0EzNXB4JTNCcGFkZGluZy1ib3R0b20lM0EzNXB4JTNCJTIyJTNFJTBBJTNDc2VsZWN0JTIwbmFtZSUzRCUyMmxpbmtzJTIyJTIwb25jaGFuZ2UlM0QlMjJ3aW5kb3cubG9jYXRpb24uaHJlZiUzRHRoaXMudmFsdWUlM0IlMjIlM0UlMEElM0NvcHRpb24lMjB2YWx1ZSUzRCUyMiUyM2tyXzIwMDVfcHJlc2VudCUyMiUyMHNlbGVjdGVkJTNFUHJvamVjdHMlMjBFeGVjdXRlZCUyMGluJTIwdGhlJTIweWVhciUyMDIwMDUtUHJlc2VudCUzQyUyRm9wdGlvbiUzRSUwQSUzQ29wdGlvbiUyMHZhbHVlJTNEJTIyJTIza3JfMTk5Ni0yMDA0JTIyJTNFUHJvamVjdHMlMjBFeGVjdXRlZCUyMGluJTIwdGhlJTIweWVhciUyMDE5OTYtMjAwNCUzQyUyRm9wdGlvbiUzRSUwQSUzQ29wdGlvbiUyMHZhbHVlJTNEJTIyJTIza3JfMTk4Ni0xOTk1JTIyJTNFUHJvamVjdHMlMjBFeGVjdXRlZCUyMGluJTIwdGhlJTIweWVhciUyMDE5ODYtMTk5NSUzQyUyRm9wdGlvbiUzRSUwQSUzQ29wdGlvbiUyMHZhbHVlJTNEJTIyJTIza3JfMTk3Ny0xOTg1JTIyJTNFUHJvamVjdHMlMjBFeGVjdXRlZCUyMGluJTIwdGhlJTIweWVhciUyMDE5NzctMTk4NSUzQyUyRm9wdGlvbiUzRSUwQSUzQyUyRnNlbGVjdCUzRSUwQSUzQyUyRmRpdiUzRQ==[/vc_raw_html][vc_column_text]
Projects Executed in the year 2005-Present
[/vc_column_text][vc_column_text]Result not Found[/vc_column_text][vc_column_text]
Projects Executed in the year 1996-2004
[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: Supply and installation of HVAC system
(chiller, FCU, AHU, Packaged mini split ducting system)
Client:General organization for Technical Education and Vocational Training
Value:2,095,000.00
Period:2004 – 2006[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/2″][vc_column_text]Project: Supply and installation of HVAC system
(chiller, FCU, AHU, Packaged mini split ducting system)
Client:General organization for Technical Education and Vocational Training
Value:670,000.00
Period:2004 – 2006[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: SSU MATSUSHITA (MECOM) AT NEW SEAPARK
Supply, Installation & Commissioning of 33KV; XLPE underground cable in Peninsular
Client:Malaysia Package “A”; Kejuruteraan R.E. Morris Sdn.Bhd.
Value:1,046,480.00
Period:Feb-04 – Sep-04[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/2″][vc_column_text]Project: Supply and installation of HVAC system
(chiller, FCU, AHU, Packaged mini split ducting system)
Client:Technical College General Organization; For education and Vocational training
Value:900,000.00
Period:2003 – 2005[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: Supply and installation of HVAC system
(chiller, FCU, AHU, Packaged mini split ducting system)
Client:MODA 50 Bed hospital; Ministry of defense & Aviation
Value:1,500,000.00
Period:2003 – 2005[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/2″][vc_column_text]Project: NEW LABIS WATER TREATMENT PLANTPACKAGE 3 (BUILDING SERVICES)
Supply, delivery, installation, testing and Commissioning, of Electrical Services, Fire Protection, ACMV, Cold Water, Plumbing &
Sanitary Services.
Client:Ranhill Civil/ Kejuruteraan R.E. Morris Sdn.Bhd.
Value:700,000.00
Period:Sept-03 – Oct-05[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: Supply and installation of HVAC system
Packaged mini split ducting system
Client:King Abdu Aziz Welfare Center; Tabuok Governor House
Value:350,000.00
Period:2002 – 2004[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/2″][vc_column_text]Project: Supply and installation of HVAC system
Packaged mini split ducting system
Client:Arab National Bank
Value:1,100,000.00
Period:2002 – 2004[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: Supply and installation of HVAC system
Packaged mini split ducting system
Client:Abbar & zainy cooled store
Value:350,000.00
Period:2002 – 2004[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/2″][vc_column_text]Project: SEMANGAR WATER SUPPLY SCHEME
Supply, deliver, installation, testing & Commissioning and maintenance of Plumbing, air-conditioning Ventilation and Fire Protection services
Client:Ranhill Civil / Kejuruteraan R.E Morris Sdn.Bhd
Value:910,000.00
Period:June-02 – Oct-03[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: Supply and installation of HVAC system
Packaged mini split ducting system
Client:Tabouk Technical College; General Organization for Tech Education
Value:1,500,000.00
Period:2001 – 2003[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/2″][vc_column_text]Project: Supply and installation of HVAC system
Packaged mini split ducting system
Client:Hail Technical College; General Organization for Tech Education
Value:1,200,000.00
Period:2001 – 2003
[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: Supply and installation of HVAC System Packaged
Mini split ducting system; Residential building for Staff
Client:Prince sultan city for Humanitarian
Value:450,000.00
Period:2001 – 2003[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/2″][vc_column_text]Project: Supply and installation of HVAC system
(chiller, FCU,AHU, packaged mini split ducting system)
Client:Prince sultan city for Humanitarian
Value:340,000.00
Period:2001 – 2003[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: 120MW POWER DEVELOPMENT SABAH IPP
HV, LV Elect, instrumentation, Testing & Commissioning work
Client:Powertron / PKESB
Value:2,400,000.00
Period:Nov-97 – May-98[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/2″][vc_column_text]Project: MMT DESIGN & CONSTRUCTION OF NEW OFFICE, PAINT & FABRICATION FACILITY ON PART OF LOT 9258 NILAI, NEGERI SEMBILAN
Supply & installation of firefighting services & All associated works.
Client:Transfields
Value:351,826.00
Period:Jan-98 – Jul-98[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: APMC KANTHAN
2 X 48MVA transformer vacuuming & oil purification work
Client:Pauwels Belgium
Value:24,000.00
Period:1996 – 1996[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/2″][/vc_column_inner][/vc_row_inner][vc_column_text]
Projects Executed in the year 1986-1995
[/vc_column_text][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: HANDUK MACHINERY (M) SDN.BHD
Supply & fabrication of steel pallets
Client:Handuk Korea
Value:216,548.00
Period:Mar-95 – 1995[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/2″][vc_column_text]Project: FELDA SELANDANG OIL MILL
2 X 40,000 lb/hr water tube boiler
Client:Yoshimine Boiler
Value:73,200.00
Period:Nov-86 – 1987[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: FELDA TENGGAROH OIL MILL
2 X 40,000 lb/hr water tube boiler
Client:Yoshimine Boiler
Value:73,200.00
Period:Oct-86 – Mar-87[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/2″][vc_column_text]Project: FELDA ADELA OIL MILL
2 X 40,000 lb/hr water tube boiler
Client:Yoshimine Boiler
Value:73,200.00
Period:Oct-86 – Mar-87[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: M.P. MATHEW OIL MILL
20,000 kg/hr water tube boiler
Client:Yoshimine Boiler
Value:285,600.00
Period:Mar-86 – Jul-86[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/2″][/vc_column_inner][/vc_row_inner][vc_column_text]
Projects Executed in the year 1977-1985
[/vc_column_text][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: SRI LINGGA OIL MILL
6,000 kg/hr water tube boiler
Client:Yoshimine Boiler
Value:83,700.00
Period:Sep-85 – Dec-85[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/2″][vc_column_text]Project: MALPOM OIL MILL
13,600 kg/hr water tube boiler
Client:Yoshimine Boiler
Value:172,000.00
Period:Apr-85 – Aug-85[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: SEONG THYE OIL MILL
12,000 kg/hr water tube boiler
Client:Yoshimine Boiler
Value:163,000.00
Period:Apr-85 – Sep-85[/vc_column_text][vc_raw_html]JTNDZGl2JTIwc3R5bGUlM0QlMjJ0ZXh0LWFsaWduJTNBbGVmdCUzQiUyMiUzRSUwQSUzQ2ElMjBjbGFzcyUzRCUyMmJ0bl90b3AlMjIlMjBocmVmJTNEJTIyJTIza3JfMjAwNV9wcmVzZW50JTIyJTNFQmFjayUyMHRvJTIwdG9wJTNDJTJGYSUzRSUwQSUzQyUyRmRpdiUzRQ==[/vc_raw_html][/vc_column_inner][vc_column_inner width=”1/2″][/vc_column_inner][/vc_row_inner][/vc_tta_section][vc_tta_section title=”Japan” tab_id=”1610472774875-52b042d7-7240″][vc_row_inner][vc_column_inner][vc_raw_html]JTNDZGl2JTIwc3R5bGUlM0QlMjJ0ZXh0LWFsaWduJTNBY2VudGVyJTNCcGFkZGluZy10b3AlM0EzNXB4JTNCcGFkZGluZy1ib3R0b20lM0EzNXB4JTNCJTIyJTNFJTBBJTNDc2VsZWN0JTIwbmFtZSUzRCUyMmxpbmtzJTIyJTIwb25jaGFuZ2UlM0QlMjJ3aW5kb3cubG9jYXRpb24uaHJlZiUzRHRoaXMudmFsdWUlM0IlMjIlM0UlMEElM0NvcHRpb24lMjB2YWx1ZSUzRCUyMiUyM2pwXzIwMDVfcHJlc2VudCUyMiUyMHNlbGVjdGVkJTNFUHJvamVjdHMlMjBFeGVjdXRlZCUyMGluJTIwdGhlJTIweWVhciUyMDIwMDUtUHJlc2VudCUzQyUyRm9wdGlvbiUzRSUwQSUzQ29wdGlvbiUyMHZhbHVlJTNEJTIyJTIzanBfMTk5Ni0yMDA0JTIyJTNFUHJvamVjdHMlMjBFeGVjdXRlZCUyMGluJTIwdGhlJTIweWVhciUyMDE5OTYtMjAwNCUzQyUyRm9wdGlvbiUzRSUwQSUzQ29wdGlvbiUyMHZhbHVlJTNEJTIyJTIzanBfMTk4Ni0xOTk1JTIyJTNFUHJvamVjdHMlMjBFeGVjdXRlZCUyMGluJTIwdGhlJTIweWVhciUyMDE5ODYtMTk5NSUzQyUyRm9wdGlvbiUzRSUwQSUzQ29wdGlvbiUyMHZhbHVlJTNEJTIyJTIzanBfMTk3Ny0xOTg1JTIyJTNFUHJvamVjdHMlMjBFeGVjdXRlZCUyMGluJTIwdGhlJTIweWVhciUyMDE5NzctMTk4NSUzQyUyRm9wdGlvbiUzRSUwQSUzQyUyRnNlbGVjdCUzRSUwQSUzQyUyRmRpdiUzRQ==[/vc_raw_html][vc_column_text]
Projects Executed in the year 2005-Present
[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: Supply & Installation of Chilled water piping and ducting, D.D.C Control complete HVAC System
Girls High Technical College HAIL
Client: Technical and Vocational / Training Corporation
Value: 3,421,980.00
Period: 2006 – 2008
[/vc_column_text][vc_separator][vc_column_text]Project: Supply and installation of Stainless Steel Pipe Steam Network
King FAHD 500 Bed
Client: Hospital Tabouk; Ministry of Health
Value: 1,392,942.00
Period: 2006 – 2008
[/vc_column_text][vc_separator][vc_column_text]Project: Supply & Installation of complete air compressed System
Bisha Technical College (BISHA)
Client: Ministry of Higher Education
Value: 273,000.00
Period: 2006 – 2008
[/vc_column_text][vc_separator][vc_column_text]Project: Supply & Installation of Chilled water piping and ducting,
D.D.C Control complete HVAC System
Client: HAIL University; Engineering College; Ministry of Higher Education
Value: 43,137,865.00
Period: 2006 – 2008
[/vc_column_text][vc_separator][vc_column_text]Project: Supply & Installation of ducting and complete HVAC System
King Faisal University
Client: Permanent Campus; Ministry of Higher Education
Value: 8,207,430.00
Period: 2006 – 2008
[/vc_column_text][vc_separator][vc_column_text]Project: Supply and installation of Chilled
Water piping and all required Fittings and AHU Installation
Client: Old Factory; AI-OBIEKAN ELOPAK; Factory for packaging Co.
Value: 175,000.00
Period: 2006 – 2008
[/vc_column_text][vc_separator][vc_column_text]Project: Supply & Installation of HVAC System and Firefighting System
Client: Ministry of Higher Education
Value: 400,000.00
Period: 2005 – 2007
[/vc_column_text][vc_separator][vc_column_text]Project: Supply & Installation of HVAC System and Firefighting System
Client: SECECO Sustation Doadmi
Value: 400,000.00
Period: 2005 – 2007
[/vc_column_text][vc_column_text]
Projects Executed in the year 1996-2004
[/vc_column_text][vc_column_text]
Result not found
[/vc_column_text][vc_column_text]
Projects Executed in the year 1986-1995
[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/2″][vc_column_text]Project: Supply & Installation of HVAC System
Technical College / QURAYYAT
Client: Technical and Vocational / Training Corporation
Value: 4,781,654.00
Period: 2006 – 2008
[/vc_column_text][vc_separator][vc_column_text]Project: Supply & Installation of HVAC System
Vocational Training Center / SHARORA
Client: Technical and Vocational/ Training Corporation
Value: 2,378,540.00
Period: 2006 – 2008
[/vc_column_text][vc_separator][vc_column_text]Project: Supply & Installation of Plumbing, HVAC ducting and
Fire Fighting System
Client: E.O.D
Value: 485,000.00
Period: 2006 – 2008
[/vc_column_text][vc_separator][vc_column_text]Project: Supply & Installation of Chilled water piping and ducting,
D.D.C Control complete HVAC System
Client: TABOUK University; Science College; Ministry of Higher Education
Value: 34,032,845.00
Period: 2006 – 2008
[/vc_column_text][vc_separator][vc_column_text]Project: Supply & Installation of Chilled water piping and ducting,
D.D.C Control complete HVAC System
Client: Girls High Technical College HAIL; Technical and Vocational Training Corporation
Value: 3,421,980.00
Period: 2006 – 2008
[/vc_column_text][vc_separator][vc_column_text]Project: Supply & Installation of Chilled water piping and ducting,
D.D.C Control Complete HVAC System
Client: Science College ZULFI; Ministry of Higher Education
Value: 9,510,540.00
Period: 2006 – 2008[/vc_column_text][vc_separator][vc_column_text]Project: Motorola Manufacturing Plant, Chennai
Client: Motorola Manufacturing Plant
Value: 80.00
Period: 2006 – 2007
[/vc_column_text][vc_separator][vc_column_text]Project: Supply & Installation of HVAC System and Firefighting System
SECECO 33 KV
Client: Substation Tabrjal
Value: 250,000.00
Period: 2005 – 2007
[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: LUMUT CCGT – EC & INSTALLATION
Erection of 6 x 168 MVA transformer, filtration, Vacuuming & 6 x 11kv Al. Busducts
Client:Peremba – Kentz
Value:600,000.00
Period:1995 – 1996[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/2″][vc_column_text]Project: BOILER MAINTENANCE/REPAIR WORK
–
Client:Ibae Boiler / Mechmar Boiler / Yoshimine Boiler / Cochran Boiler / Scotland / Meidensha & Nigata
Value:596,375.40
Period:Jan-92 – Nov-92[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: TAITEC INDUSTRIES S/B – CHEMOR, PERAK
Supply, fabricate & install wood chip firing Boiler KHT100
Client:Takashi Boiler Japan
Value:67,700.00
Period:Feb-92 – 1992[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/2″][vc_column_text]Project: TUANKU JAAFAR POWER STATION, P. DICKSON
Power Plant rehabilitation & gas conversion Elect. Control & Instrument work
Client:Siemens AG
Value:3,000,000.00
Period:1992 – 1995[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: GULA PADANG TERAP – KEDAH
Supply, fabricate & install 80 ton/hr boiler, H2200
Client:Yoshimine Boiler
Value:591,912.00
Period:Jun-91 – 1992[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/2″][vc_column_text]Project: CONNAUGHT BRIDGE POWER STATION
Gas conversion project 2 x 100 MW Turbine
Client:Siemens AG
Value:266,648.00
Period:Sep-91 – Apr-92[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: STULANG DARAT SUB-STATION – JOHOR BAHRU
Installation of 2 x 60 MVA 132/33kv Transformer
Client:ABB Sweden
Value:40,500.00
Period:1991 – 1991[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/2″][vc_column_text]Project: SG. MATI SUB-STATION MUAR
Installation of 2 x 30 MVA 132/33 kv Transformer
Client:ABB Sweden
Value:36,000.00
Period:1990 – 1990[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: BOILER MAINTENANCE/REPAIR WORK
–
Client:Yoshimine Boiler / Dah Yung Boiler / Takuma Boiler / Clarke Chapman / Chiyoda Boiler
Value:765,706.95
Period:1987 – 1989[/vc_column_text][vc_column_text]
Projects Executed in the year 1977-1985
[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/2″][vc_column_text]Project: SARAWAK ELECTRICITY BOARD (Deshon S/T, Kemantan S/T, Engkelli S/T)
Takaoka Transformer installation work from 80 MVA to 1.375 MVA shunt reactor (12 units)
Client:Fuji Electric
Value:394,000.00
Period:1987 – 1989[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: PAKA POWER STATION
6 units circulating water pump
Client:Kubota – Japan
Value:530,811.00
Period:1985 – 1986[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/2″][vc_column_text]Project: KUCHING WATER BOARD – SARAWAK
Water treatment plant
Client:Kubota – Japan
Value:165,040.00
Period:Aug-84 – Jul-85[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: PORT KLANG POWER STATION, PHASE 1
Electro-chlorination Plant
Client:Daiki Engineering – Japan
Value:172,490.00
Period:1984 – 1985[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/2″][vc_column_text]Project: PORT KLANG POWER STATION, PHASE 1
4 units Circulating Water Plant
Client:Kubota – Japan
Value:536,740.00
Period:Jun-84 – Apr-85[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: TEMENGOR POWER STATION
Repair Hydro Turbine Wicket Gates (4 units)
Client:Hitachi – Japan
Value:150,000.00
Period:1982[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/2″][vc_column_text]Project: PRAI POWER STATION, STAGE 3
6 units Circulating Water Pump
Client:Kubota – Japan
Value:550,000.00
Period:1982-1983
[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: KEMAMAN POWER STATION
3 X 2MW Diesel Generating Sets and 11kv Switchgear
Client:Meidensha & Fuji Denki Japan
Value:78,350.00
Period:Apr-82 – Jul-82[/vc_column_text][vc_raw_html]JTNDZGl2JTIwc3R5bGUlM0QlMjJ0ZXh0LWFsaWduJTNBbGVmdCUzQiUyMiUzRSUwQSUzQ2ElMjBjbGFzcyUzRCUyMmJ0bl90b3AlMjIlMjBocmVmJTNEJTIyJTIzanBfMjAwNV9wcmVzZW50JTIyJTNFQmFjayUyMHRvJTIwdG9wJTNDJTJGYSUzRSUwQSUzQyUyRmRpdiUzRQ==[/vc_raw_html][/vc_column_inner][vc_column_inner width=”1/2″][/vc_column_inner][/vc_row_inner][/vc_tta_section][vc_tta_section title=”Singapore” tab_id=”1610472784816-301e1963-908c”][vc_row_inner][vc_column_inner][vc_raw_html]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[/vc_raw_html][vc_column_text]
Projects Executed in the year 2005-Present
[/vc_column_text][vc_column_text]Result not Found[/vc_column_text][vc_column_text]
Projects Executed in the year 1996-2004
[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: SINGAPORE AROMATIC , PULAU AYER CHAWAN, SINGAPORE
Elec. & Instrumentation works.
Client:Siemens (MSW Joint Venture)
Value:3,000,000.00
Period:1997 – 1997[/vc_column_text][vc_column_text]
Projects Executed in the year 1986-1995
[/vc_column_text][vc_column_text]Result not Found[/vc_column_text][vc_column_text]
Projects Executed in the year 1977-1985
[/vc_column_text][vc_column_text]Result not Found[/vc_column_text][vc_raw_html]JTNDZGl2JTIwc3R5bGUlM0QlMjJ0ZXh0LWFsaWduJTNBbGVmdCUzQiUyMiUzRSUwQSUzQ2ElMjBjbGFzcyUzRCUyMmJ0bl90b3AlMjIlMjBocmVmJTNEJTIyJTIzc2lnXzIwMDVfcHJlc2VudCUyMiUzRUJhY2slMjB0byUyMHRvcCUzQyUyRmElM0UlMEElM0MlMkZkaXYlM0U=[/vc_raw_html][/vc_column_inner][vc_column_inner width=”1/2″][/vc_column_inner][/vc_row_inner][/vc_tta_section][vc_tta_section title=”Vietnam” tab_id=”1610472798971-294a33d5-f16c”][vc_row_inner][vc_column_inner][vc_raw_html]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[/vc_raw_html][vc_column_text]
Projects Executed in the year 2005-Present
[/vc_column_text][vc_column_text]Result not found[/vc_column_text][vc_column_text]
Projects Executed in the year 1996-2004
[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: PROTON ELECTRICAL SUPPLY FOR M27 NEW LINE AT JIG SHOP
Supply, testing & commissioning of 1000 AMP Busduct
Client:Meiden
Value:91,000.00
Period:Feb-00 – Apr-00[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/2″][vc_column_text]Project: Supply and installation of HVAC system
Packaged mini split ducting system Zulfi 150 bed hospital
Client:Ministry of health
Value:800,000.00
Period:1999 – 2001[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: CONTRACT NO. 1226/96, TNB 310295 – MAINHEAD “A” MAX HARTA AND TELUK PANGLIMA GARANG’S SUB-STATION
Erection of 4 x90 MVA 33/132kv & 4 x 30MVA; 11/132kv power transformer
Client:EPE Reyrolle (M) S/B
Value:228,000.00
Period:Jun-99 – Feb-00[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/2″][vc_column_text]Project: MCF 8 – 12/14 MVA TRANSFORMER
Re-energising & treater #5 elect. Work
Client:Mesceong (M) S/B
Value:126,240.00
Period:Jan-99 – Mar-99[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: Supply and installation of duct and Desert water cooler
Mini tent
Client:Ministry of Public work
Value:700,000.00
Period:1998 – 2000[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/2″][vc_column_text]Project: TNB 1227/96 LEMBAH BERINGIN 275 KV S/S
Erection of 2 x 240MVA; 2 x 90MVA; 2 x30mva
Client:Power transformers; EPE Reyrolle
Value:185,000.00
Period:Apr-98 Dec -98[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text]Project: ABB 180MVA TRANSFORMER AT SSAAPS, PHASE 3 KAPAR
Vacuuming & circulation of power transformers
Client:TBV Power
Value:10,000.00
Period:Jun-98 Jun-98[/vc_column_text][vc_column_text]
Projects Executed in the year 1986-1995
[/vc_column_text][vc_column_text]Result not found[/vc_column_text][vc_column_text]
Projects Executed in the year 1977-1985
[/vc_column_text][vc_column_text]Result not found[/vc_column_text][vc_raw_html]JTNDZGl2JTIwc3R5bGUlM0QlMjJ0ZXh0LWFsaWduJTNBbGVmdCUzQiUyMiUzRSUwQSUzQ2ElMjBjbGFzcyUzRCUyMmJ0bl90b3AlMjIlMjBocmVmJTNEJTIyJTIzdmlfMjAwNV9wcmVzZW50JTIyJTNFQmFjayUyMHRvJTIwdG9wJTNDJTJGYSUzRSUwQSUzQyUyRmRpdiUzRQ==[/vc_raw_html][/vc_column_inner][vc_column_inner width=”1/2″][/vc_column_inner][/vc_row_inner][/vc_tta_section][vc_tta_section title=”Others” tab_id=”1610472816724-8ac84354-8236″][vc_row_inner][vc_column_inner][vc_raw_html]JTNDZGl2JTIwc3R5bGUlM0QlMjJ0ZXh0LWFsaWduJTNBY2VudGVyJTNCcGFkZGluZy10b3AlM0EzNXB4JTNCcGFkZGluZy1ib3R0b20lM0EzNXB4JTNCJTIyJTNFJTBBJTNDc2VsZWN0JTIwbmFtZSUzRCUyMmxpbmtzJTIyJTIwb25jaGFuZ2UlM0QlMjJ3aW5kb3cubG9jYXRpb24uaHJlZiUzRHRoaXMudmFsdWUlM0IlMjIlM0UlMEElM0NvcHRpb24lMjB2YWx1ZSUzRCUyMiUyM290aF8yMDA1X3ByZXNlbnQlMjIlMjBzZWxlY3RlZCUzRVByb2plY3RzJTIwRXhlY3V0ZWQlMjBpbiUyMHRoZSUyMHllYXIlMjAyMDA1LVByZXNlbnQlM0MlMkZvcHRpb24lM0UlMEElM0NvcHRpb24lMjB2YWx1ZSUzRCUyMiUyM290aF8xOTk2LTIwMDQlMjIlM0VQcm9qZWN0cyUyMEV4ZWN1dGVkJTIwaW4lMjB0aGUlMjB5ZWFyJTIwMTk5Ni0yMDA0JTNDJTJGb3B0aW9uJTNFJTBBJTNDb3B0aW9uJTIwdmFsdWUlM0QlMjIlMjNvdGhfMTk4Ni0xOTk1JTIyJTNFUHJvamVjdHMlMjBFeGVjdXRlZCUyMGluJTIwdGhlJTIweWVhciUyMDE5ODYtMTk5NSUzQyUyRm9wdGlvbiUzRSUwQSUzQ29wdGlvbiUyMHZhbHVlJTNEJTIyJTIzb3RoXzE5NzctMTk4NSUyMiUzRVByb2plY3RzJTIwRXhlY3V0ZWQlMjBpbiUyMHRoZSUyMHllYXIlMjAxOTc3LTE5ODUlM0MlMkZvcHRpb24lM0UlMEElM0MlMkZzZWxlY3QlM0UlMEElM0MlMkZkaXYlM0U=[/vc_raw_html][vc_column_text]Result not found[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/2″][/vc_column_inner][vc_column_inner width=”1/2″][/vc_column_inner][/vc_row_inner][/vc_tta_section][/vc_tta_tabs][/vc_column][/vc_row]